Justia Contracts Opinion Summaries

Articles Posted in Government Contracts
by
Meridian contracted to construct the Chula Vista Project flood control project, including construction of concrete channels, relocation of a sewer line, and dewatering and water diversion. After commencing work, Meridian encountered problems relating to “a layer of dripping saturated dark clay material under which a clean layer of sand is producing water” with “the potential for serious structural damage.” The government issued contract modifications, including an increase in funds for larger pipe, addition of a reinforced concrete access ramp, investigation of soil properties, remediation of saturated soils, and additional sheet piling. The government directed Meridian to suspend work following structural failures and terminated the project following a final inspection. Meridian sued for breach of contract, breach of the duty of good faith and fair dealing, and violation of the Contract Disputes Act, 41 U.S.C. 601−613. The government conceded liability for certain costs relating to suspension of work, channel fill, and interim protection. With respect to other claims, the Federal Circuit affirmed in part. Meridian’s interpretation of the contract was not reasonable; the existence of subsurface saturated soil conditions was “reasonably foreseeable.” The Trade Court did not impose an improper requirement for investigation of site conditions beyond what a reasonable contractor would undertake. The court remanded for consideration of whether the parties reached a meeting of the minds on flood event claims and held that the Trade Court erred dismissing Meridian’s unpaid contract quantities claim, in light of conflicting information. View "Meridian Engineering Co. v. United States" on Justia Law

by
Meridian contracted to construct the Chula Vista Project flood control project, including construction of concrete channels, relocation of a sewer line, and dewatering and water diversion. After commencing work, Meridian encountered problems relating to “a layer of dripping saturated dark clay material under which a clean layer of sand is producing water” with “the potential for serious structural damage.” The government issued contract modifications, including an increase in funds for larger pipe, addition of a reinforced concrete access ramp, investigation of soil properties, remediation of saturated soils, and additional sheet piling. The government directed Meridian to suspend work following structural failures and terminated the project following a final inspection. Meridian sued for breach of contract, breach of the duty of good faith and fair dealing, and violation of the Contract Disputes Act, 41 U.S.C. 601−613. The government conceded liability for certain costs relating to suspension of work, channel fill, and interim protection. With respect to other claims, the Federal Circuit affirmed in part. Meridian’s interpretation of the contract was not reasonable; the existence of subsurface saturated soil conditions was “reasonably foreseeable.” The Trade Court did not impose an improper requirement for investigation of site conditions beyond what a reasonable contractor would undertake. The court remanded for consideration of whether the parties reached a meeting of the minds on flood event claims and held that the Trade Court erred dismissing Meridian’s unpaid contract quantities claim, in light of conflicting information. View "Meridian Engineering Co. v. United States" on Justia Law

by
Area 51 used Alameda city property for events it planned for third-party companies. PM assisted the city with managing the license arrangements. Due to problems connected with Area 51 events, the city ceased doing business with it. Area 51 had committed to third-party entities based on PM’s previous confirmation of the city’s willingness to license space. Area 51 sued. Defendants (city, PM, and individuals) filed a demurrer and a motion to strike under Code of Civil Procedure section 425.16, the anti-SLAPP (strategic lawsuit against public participation) statute. The court denied that motion and granted the demurrer. The court of appeal reversed in part. While the thrust of the claims against the city is breach of contract, the individual defendants were not contracting parties; the sole basis for asserting liability against them is what they did on behalf of the city. That conduct is expressive in nature (emails confirming dates, and announcing termination of the leasing relationship), which qualify as “written or oral statement[s] . . . made in connection with an issue under consideration . . . by a[n] . . . executive . . . body,” under the anti-SLAPP law. Area 51 could not show a probability of prevailing on the merits. The case was remanded for consideration of an award of attorneys’ fees and costs. View "Area 51 Productions, Inc. v. City of Alameda" on Justia Law

by
Oklahoma and the Citizen Potawatomi Nation (the “Nation”) entered into a Tribal-State gaming compact; Part 12 of which contained a dispute-resolution procedure that called for arbitration of disagreements “arising under” the Compact’s provisions. The terms of the Compact indicated either party could, “[n]otwithstanding any provision of law,” “bring an action against the other in a federal district court for the de novo review of any arbitration award.” In Hall Street Associates, LLC. v. Mattel, Inc., 552 U.S. 576, (2008), the Supreme Court held that the Federal Arbitration Act (“FAA”) precluded parties to an arbitration agreement from contracting for de novo review of the legal determinations in an arbitration award. At issue before the Tenth Circuit Court of Appeals was how to treat the Compact’s de novo review provision given the Supreme Court’s decision in Hall Street Associates. The Nation argued the appropriate course was to excise from the Compact the de novo review provision, leaving intact the parties’ binding obligation to engage in arbitration, subject only to limited judicial review under 9 U.S.C. sections 9 and 10. Oklahoma argued the de novo review provision was integral to the parties’ agreement to arbitrate disputes arising under the Compact and, therefore, the Tenth Circuit should sever the entire arbitration provision from the Compact. The Tenth Circuit found the language of the Compact demonstrated that the de novo review provision was a material aspect of the parties’ agreement to arbitrate disputes arising thereunder. Because Hall Street Associates clearly indicated the Compact’s de novo review provision was legally invalid, and because the obligation to arbitrate was contingent on the availability of de novo review, the Tenth Circuit concluded the obligation to arbitrate set out in Compact Part 12 was unenforceable. Thus, the matter was remanded to the district court to enter an order vacating the arbitration award. View "Citizen Potawatomi Nation v. State of Oklahoma" on Justia Law

by
Securiforce entered into a requirements contract with the government to deliver fuel to eight sites in Iraq. The government terminated the contract for convenience with respect to two sites because Securiforce intended to supply fuel from Kuwait, reasoning that delivery to those sites would violate the Trade Agreements Act, 19 U.S.C. 2501, and that obtaining a waiver would take too long. Weeks later, the government ordered small deliveries to two sites, to occur by October 24. Securiforce indicated that it could not deliver until November. The government notified Securiforce that it should offer justifiable excuses or risk termination. Securiforce responded that the late deliveries were excused by improper termination for convenience, failure to provide required security escorts, small orders, and other alleged irregularities. The government terminated the contract for default. Securiforce filed suit (Tucker Act, 28 U.S.C. 1491; Contract Disputes Act, 41 U.S.C. 7101-09). The Claims Court found that it had jurisdiction to review both terminations; that the Contracting Officer abused her discretion in partially terminating the contract for convenience; and that the termination for default was proper. The Federal Circuit affirmed in part. The court lacked jurisdiction over the termination for convenience; a contractor’s request for a declaratory judgment that the government materially breached a contract violates the rule that courts will not grant equitable relief when money damages are adequate. The government did not breach the contract by terminating for convenience or with respect to providing security. View "Securiforce International America, LLC v. United States" on Justia Law

by
California-American, a water utility, and Marina and Monterey, public water agencies, entered into contracts to collaborate on a water desalination project, stating that the prevailing party of “any action or proceeding in any way arising from [their a]greement” would be entitled to an award of attorney fees and costs. After learning that a member of Monterey’s board of directors had a conflict of interest, having been paid for consulting work to advocate on behalf of Marina, California-American sued to have the contracts declared void under Government Code section 1090. Monterey agreed that the contracts were void. Marina filed cross-claims seeking a declaration that the contracts were “valid and enforceable.” Years of litigation culminated in a holding declaring the agreements void. Marina challenged post-judgment orders that California-American and Monterey were entitled to costs as prevailing parties under Code of Civil Procedure sections 1032 and 1717 and granting them specific attorney fees awards. The court of appeal affirmed, rejecting Marina’s argument that they were not entitled to awards because the underlying contracts were declared void. The illegality exception to the rule of mutuality of remedies applies when the contract's subject matter is illegal but does not apply when the litigation involves the “invalidity” or “unenforceability” of an otherwise legal contract. View "California-American Water Co. v. Marina Coast Water District" on Justia Law

by
At issue was whether, during the sale of JB&A, Inc., a government contracting firm, to MCR Federal, LLC, another government contractor, MCR’s false statement of that a representation and warranty in the contract remained true was a fraudulent act independent of the contractual relationship such that JB&A properly brought actions for both fraud and breach of contract. The trial court held MCR liable for breach of contract and constructive fraud and awarded $12 million in compensatory damages. The Supreme Court affirmed in part and reversed in part, holding (1) JB&A did not bring proper claims for actual or constructive fraud; (2) the evidence presented at trial established that MCR’s breach of contract caused JB&A substantial damages; (3) the trial court properly granted compensatory damages of $12 million and pre-judgment interest of $3.5 million; and (4) the trial court erred in awarding JB&A attorney’s fees in the amount of $1.9 million for prevailing on its claim of constructive fraud. View "MCR Federal, LLC v. JB&A, Inc." on Justia Law

by
This interlocutory appeal concerned a contract dispute about the provision of food services at the Fort Riley Army base in Kansas. The Department of the Army (Army) contracts with outside vendors for food preparation and related supporting services for its cafeteria dining facilities at Fort Riley. Since 2006, the State of Kansas, through the Kansas Department for Children and Families (Kansas), successfully bid under the RSA on those food preparation and related services contracts at Fort Riley. Kansas’s most recent contract awarded under the RSA was scheduled to expire in February 2016. As that date approached, the Army determined that its next dining contract at Fort Riley would be for supporting services only. The Army therefore decided that it need not solicit bids under the RSA and it approached another vendor directly, as permitted by the JWOD. Kansas took exception to the Army’s decision because it eliminated Kansas’s ability to bid on the contract. So Kansas initiated arbitration proceedings under the RSA’s dispute resolution provisions. And upon learning that the Army intended to contract with the other vendor despite the commencement of arbitration proceedings, Kansas sued in federal court, seeking to preliminarily enjoin the Army from executing the JWOD contract pending arbitration. The root of the dispute was the intersection of two federal statutes that both address the procurement of food services at federal facilities: (1) the Randolph-Sheppard Vending Facility Act of 1936 (RSA), and (2) the Javits Wagner O’Day Act (JWOD). The parties disagreed as to which of these statutes governed the award of the Fort Riley food services contract. And due to events that have occurred since this action was filed, the parties also disputed whether this appeal was rendered moot. The Tenth Circuit concluded that the issue raised by this appeal fell within an exception to the mootness doctrine for matters capable of repetition yet evading review. Because an arbitration panel has since issued its decision thereby dissolving the injunction at issue in this appeal, the Court declined to address whether the district court correctly granted the injunction. View "Kansas Department for Children v. SourceAmerica" on Justia Law

by
Robbin Taylor filed a statement of charges seeking recall of Black Diamond City council member Patricia Pepper. In November 2015, Pepper defeated opponent Ron Taylor (husband of Robbin Taylor) in an election for Black Diamond City Council in King County. Beginning in January 2016, a chasm developed with Mayor Carol Benson and council members Tamie Deady and Janie Edelman on one side, and a majority of the city council - Pepper, Erika Morgan, and Brian Weber - on the other. After Pepper, Morgan, and Weber passed R-1069, they voted to fire city attorney Carol Morris. Upon passing R-1069, Pepper and a majority of the council made decisions to alter contracts regarding the Master Development Review Team (MDRT) contracts for two large development projects planned in Black Diamond that had been approved by Mayor Benson and former council members. Mayor Benson hired emergency interim city attorney Yvonne Ward. Ward submitted two memoranda to the council, concluding that R-1069 violated the Black Diamond Municipal Code (BDMC) and the Open Public Meetings Act (OPMA), chapter 42.30 RCW. The council had also received advice from prior city attorney Morris and from the city's risk management pool that the resolution could create liability for the city if council members violated the OPMA. Ultimately, the council's decision to enact R-1069 and revisit the MDRT contracts, among other actions, led to a lawsuit: MDRT contractor CCD Black Diamond Partners LLC (Oakpointe) filed suit against the city and council members Pepper, Morgan, and Weber, alleging violations of the OPMA, which has led to litigation and costs for the city. Pepper was a member of council standing committees; allegations were made that Pepper, Morgan, and Weber held secret council and standing committee meetings conducting city business in violation of the OPMA. After approximately a year and a half of tensions, Taylor filed a statement of charges with the King County Elections Division, requesting Pepper's recall. The superior court ruled that four of those charges were factually and legally sufficient to support a recall petition. Pepper appealed. After review, the Washington Supreme Court affirmed the trial court's decision with regard to the first three charges, but reversed with regard to the fourth charge. View "In re Recall of Pepper" on Justia Law

by
The Oak Ridge, Tennessee uranium-enrichment facilities for the Manhattan Project, the World War II effort to build the first atomic bomb, have been inactive since the mid-1980s. The Department of Energy has worked to clean up the hazardous waste and hired Bechtel, a global engineering and construction firm. Bechtel hired Eagle to help decontaminate the complex, which required the demolition of buildings and equipment across the 2,200-acre complex and removal of radioactive nuclear waste, followed by decontamination of the soil and groundwater to make the site safe for redevelopment. Eagle’s work proved significantly more challenging and expensive than either party anticipated. Their contract allowed Bechtel to make changes; if those changes caused Eagle’s costs to increase, Bechtel was to make equitable adjustments in price and time for performance. Eight years after completing its work, Eagle filed suit, seeking compensation for its extra work and for excess waste that Eagle removed. The district court awarded Eagle the full amount of each request, plus interest and attorney’s fees. The Sixth Circuit affirmed the award of damages and attorney’s fees, but remanded so that the court can recalculate the interest to which Eagle is entitled under the Tennessee Prompt Pay Act. View "Eagle Supply & Manufacturing L.P. v. Bechtel Jacobs Co." on Justia Law